KARPAGAM GARDENS, ADYAR
KARPAGAM GARDENS, ADYAR
Kailash is designed as a study in effortless elegance, balancing enduring structural integrity with a soft, welcoming aesthetic. Situated in the tranquil enclave of Karpagam Garden, these residences are crafted for those who value a lifestyle that
is both grounded and elevated. The interiors are characterized by seamless transitions and refined fittings, creating a sense of quiet sophistication. By combining high-quality construction with the peaceful atmosphere of one of the city’s most serene neighbourhoods, Kailash offers a residential experience that feels uniquely secluded yet perfectly placed.
NO. OF FLOORS
4 FLOORS
UNIT TYPE
3 BHK
NO. OF UNITS
4 UNITS
SIZE RANGE
2,675 SQ. FT.
Planning Permit No. OL-PP/NHRB/0082/2025 DATED 11.03.2025
Building Permit No. CEBA/WDCN13/00129/2025 DATED 24.03.2025
TNRERA No. – Not Applicable
A glimpse into a life defined by soft light and architectural stillness.




• Seismic zone III compliant RCC frame structure.
• Solid concrete block masonry.
• Stone cladding on sections of external wall faces.
Stainless steel single bowl sink and draining board in kitchen and utility of Nirali or equivalent make.
– Doors Melamine polished finish. Yale or equivalent brand lock with Stainless Steel fittings.
glass or equivalent.
– Single lever hot and cold-water mixer unit for high pressure showers.
– Concealed master-controlled stop cock in each restroom on the inside for easy maintenance.
– Provision for Geyser in all the toilets.
– Hot water connection in all wash basins.
– Hot water connections in the Kitchen.
– Finished with Asian putty, one coat of primer, two coats of Asian paint emulsion with roller finish.
All products like switches and accessories, PVC conduits, switchgear, wiring cable etc. are compliant with IS code of Practice for electrical wiring.
including air-conditioning.
(While all reasonable care has been taken in providing the information, thespecifications mentioned are subject to change, as may be required by the Developer an d Architect, whose decision will be final. Any change in specifications would be equivalent to or of a higher standard.)
| STATE OF CONSTRUCTION | STATUS | ||||
|---|---|---|---|---|---|
| Foundation |
|
||||
| Floor | STILT | 1st | 2nd | 3rd | 4th |
![]() |
![]() |
![]() |
![]() |
![]() |
|
| Roof Slab | ![]() |
![]() |
![]() |
![]() |
|
| Block Work | ![]() |
![]() |
![]() |
![]() |
|
| Plastering | ![]() |
![]() |
![]() |
![]() |
|
| Flooring | ![]() |
![]() |
![]() |
![]() |
|
| Painting | |||||
| Common Area Works | |||||
| External Finish Works | |||||
| Ready for Handover | |||||