Gitanjali

HARRINGTON ROAD, CHETPET

Gitanjali

HARRINGTON ROAD, CHETPET

Architecturally Refined Residences on Harrington Road

Gitanjali is a testament to refined urban living, situated on the iconic Harrington Road. These stylised residences are built for those who demand an uncompromising standard of quality and comfort. Each spacious 4 BHK home is thoughtfully designed to includea dedicated study and staff quarters with a separate entry, ensuring total privacy and functional independence. At Gitanjali, luxury is not just a feature but a lifestyle, where every detail is curated to offer an expansive and sophisticated environment in one of the city’s most sought-after avenues.

NO. OF FLOORS

3 FLOORS

UNIT TYPE

4 BHK

NO. OF UNITS

5 UNITS

SIZE RANGE

3,000 SQ. FT.

Planning Permit No. PPA/WDCN09/09146/2024 DATED 28.10.2024
Building Permit No. BA/WDCN09/07439/2024 DATED 28.10.2024
TN RERA No. – Not Applicable

Gallery

A visual study of light, scale, and architectural precision.

Amenities

Specifications

Structure

• Seismic zone III compliant RCC frame structure.
• Solid concrete block masonry.

  • Foyer; Living; Dining.
    – Imported marble with coordinated skirting.
  • Bedrooms
    – 2’*2’ Vitrified tiles with coordinated skirting.
  • Kitchen
    – 2’*2’ Vitrified tiles with coordinated skirting
    – 1’*2’ backsplash glazed tile up to 2’ above counter.
  • Balcony
    – 2’*2’ Vitrified tiles with coordinated skirting.
  • Utility
    – 1’*2’ Vitrified non-skid tiles with suitable dado 1’*2” in wet area up to 3’ height.
  • Toilet
    – 1’*2’ Vitrified non-skid tiles with suitable dado up to 7’6” height.
  • Terrace Decks
    – All-weather proof tiles.
  • Polished black granite platform with double nose edge at ergonomic 32” from the floor, over RCC counter supported by suitable brickwork.
  • Stainless steel single bowl sink and draining board in kitchen and utility of Nirali or equivalent make.
  • Provision for exhaust.
  • Main Door
    – 7’6” *3’6” Height –Teak wood door shutter along with suitable frame.
  • Internal Doors
    – 7’6” Height – Factory finished 32 mm thick Veneer door shutter along with suitable frame. Yale or equivalent brand locks with Stainless Steel fittings.
  • Windows
    – UPVC window frames and profiles. Sliding with Saint- Gobain glass or equivalent.
  • French Doors
    – UPVC profiles with Saint-Gobain glass or equivalent.
  • Grills
    – MS Grills fixed on to the walls. Zinc Chromate Anti corrosive primer with Enamel Paint.
  • Sanitary ware
    – Kohler/Roca or equivalent.
  • C.P. Fittings
    – Roca/Kohler or equivalent.

     
  • Internal walls
    Finished with Asian putty, one coat of primer, two coats of Asian paint.
  • Internal ceilings
    Finished with Asian putty, emulsion (Asian Paints) roller finish.
  • Exterior walls
    Weatherproof exterior emulsion.
  • Pavement
    – Paving with granolithic flooring/concrete interlock pavers.
    – Drains along the compound wall to divert rain water to rain harvesting pit.
  • Landscaping
    – As per the Architect’s detailing.
  • Elevator
    – One 8 passengers capacity elevator of Johnson or equivalent make.
  • Generator
    – Generator of the required rating to cater lights, fan point in all rooms, Calling bell, Fridge point, Three AC in each apartment and for adequate lighting in the common area and to operate motor pump and elevator.
  • Security
    – Access control lobby doors.
    – CCTV cameras in common areas.
    – Video door bell.
  • Ground floor lobby
    – Polished granite combination design flooring with matched skirting.
  • Upper Floor Lobbies
    – Polished granite slab with matched skirting.
  • Staircases
    – Granite flooring with skirting
  • Pavement
    – Paving with granolithic flooring/concrete interlock pavers.
    – Drains along the compound wall to divert rain water to rain harvesting pit.
  • Landscaping
    – As per the Architect’s detailing.
  • Elevator
    – One 8 passengers capacity elevator of Johnson or equivalent make.
  • Generator
    – Generator of the required rating to cater lights, fan point in all rooms, Calling bell, Fridge point, Three AC in each apartment and for adequate lighting in the common area and to operate motor pump and elevator.
  • Security
    – Access control lobby doors.
    – CCTV cameras in common areas.
    – Video door bell.
  • Rainwater harvesting system.
  • OH tank with float switch.
  • Pressure pump.
  • Toilets for drivers/servants.

  • EV charging points in the Stilt floor.

(While all reasonable care has been taken in providing the information, thespecifications mentioned are subject to change, as may be required by the Developer an d Architect, whose decision will be final. Any change in specifications would be equivalent to or of a higher standard.)

Construction Status

23/07/Vector.png">
STATE OF CONSTRUCTION STATUS
Foundation
Floor STILT 1st 2nd 3rd
Roof Slab
Block Work
Plastering
Flooring
Painting
Common Area Works
External Finish Works
Ready for Handover